Tuesday, January 4, 2011

Preparing the stemwalls for beam construction


Here we sit waiting for better weather to bring out the big beams. We will be assembling six bays with steel and mortise and tenon joints and then get a crane to stand up the bays. The center point of the bays will be about 30 feet in the center. The top surface of the 12 by 12's in this photo will be expose as the first floor flooring will be set flush with these beams. Stay tuned; Ed